Protection, Control & MV Switchgear

Close the gaps between protection requirements, switchgear drawings and equipment interfaces. Alnitak supports the review and coordination needed to prepare MV systems for manufacture, testing and commissioning.

Discuss a project

When to involve Alnitak

  • Relay, CT/VT and control requirements are spread across multiple documents.
  • Interlocking and signal interfaces need agreement between vendors.
  • Open technical comments are delaying FAT or site readiness.

Engineering scope

  • Protection philosophy and relay-related engineering support
  • CT/VT application and sizing support
  • Control circuits, interlocking and auxiliary-supply interfaces
  • Status/alarm signal lists and communication-interface review
  • MV switchgear and RMU document review, testing and commissioning support

What your package can include

  • Protection and control review notes
  • CT/VT application checks and coordination inputs
  • Signal, interlocking and interface comment schedules
  • Vendor drawing review and technical query registers
  • Functional verification and test-documentation inputs

Project interfaces

  • Switchgear manufacturers and protection engineers
  • Transformer protection and downstream distribution
  • Control/monitoring systems and commissioning teams

Project stages

  • Basic design
  • Detailed design
  • Vendor engineering
  • FAT/SAT
  • Commissioning support

Tools & engineering basis

Relay platforms, configuration access, testing responsibilities and applicable IEC/ANSI or project requirements are established for each scope. Equipment versions and approved settings form part of the review basis.

Relevant sectors

Scope questions

What documents support an effective interface review?

Typical inputs include the SLD, protection philosophy, relay list, CT/VT data, control schematics, signal lists and vendor drawings. The review boundary should identify which equipment and responsibilities are included.

Does review support include equipment approval?

The assignment defines technical review, recommendation and checking responsibilities. Formal approvals, manufacturer obligations and any regulated sign-off remain with the parties identified by the project.

Discuss a project

Let’s define your next engineering work package.

Tell us the system, project stage and deliverables you need. We can establish the scope and the right form of support.

Discuss a project